A well-planned expedition helps ensure safe and efficient operations at sea. Skagerak Facility can help you coordinate the practical and technical preparations.
Some information is required when you submit your booking enquiry, while other arrangements are made once the expedition's schedule and dates have been confirmed.
Before your expedition
It is important to start planning well in advance. The preparations required depend on the expedition's objectives, operating area and the equipment to be used.
What you need to prepare:
- The expedition's objectives, dates, operating area and cruise plan.
- Any necessary permits and approvals.
- Scientific equipment and technical requirements.
- Participants, accommodation and safety documentation.
- Loading, mobilisation and other practical preparations.
Permits and cruise planning
Before your expedition, you need to prepare a detailed plan identifying the areas to be investigated, planned sampling stations, measurements and other activities. The plan should also account for transit between survey areas and any planned port calls.
Depending on where and how the expedition will be carried out, various permits and approvals may be required. These may relate to scientific investigations, sampling or hydrographic surveys. Operations in the waters of other countries may require specific permits.
The project leader needs to investigate permit requirements at an early stage and clarify the division of responsibilities with Skagerak Facility. Processing times may affect whether the expedition can proceed as planned.
If the cruise plan or planned activities change, you must inform Skagerak Facility. Changes may affect staffing, budgets, permits and equipment availability. Changes to the expedition plan must be managed in accordance with agreed procedures, including through Marine Facilities Planning (MFP).
Equipment and technical preparations
Before your expedition, you need to confirm which scientific instruments and sampling equipment will be used.
If you plan to bring your own equipment, Skagerak Facility will need information including:
- Equipment dimensions and weight.
- Lifting points and any requirements for cranes or winches.
- Power, water, gas and data connections.
- How the equipment will be installed and secured on board.
- Any special handling or storage requirements.
Project-specific installations, modifications and lifting operations must be reviewed and approved in advance. You should also notify Skagerak Facility if you require additional technical support or specialised equipment that is not permanently installed on the vessel.
Equipment availability and any additional costs must be confirmed for each expedition.
Related page: Scientific equipment and laboratories
Participants, accommodation and safety
Skagerak Facility needs to know well in advance which researchers, students and other project participants will be joining the expedition.
The number of available places depends on factors including the expedition's duration, operating area, crew size and requirements for technical personnel. Cabin allocation is planned according to the expedition's circumstances.
The project leader provides participant details in accordance with current procedures. Participants will then receive information about any additional details required before departure, for example for accommodation and onboard safety arrangements.
Certain activities require specific risk assessments, operating procedures and technical certificates. Chemicals, gas cylinders, batteries and other dangerous goods must be declared in advance and may only be brought on board following approval.
If the expedition requires round-the-clock operations, this must also be communicated well in advance so that staffing and work schedules can be planned.
Related page: Life on board R/V Skagerak
Pre-voyage planning meeting and mobilisation
Before departure, Skagerak Facility and the vessel's responsible personnel review the expedition's planned activities with the project leader. This includes the cruise plan, sampling activities, equipment, safety, staffing and practical preparations.
Mobilisation involves transporting project equipment and materials to the vessel, loading them on board and preparing them for the expedition.
Mobilisation is normally scheduled before departure. The date and port are determined according to the vessel's schedule and the project's requirements. Mobilisation may also need to take place over a weekend.
The project team is normally responsible for transporting its own equipment to the agreed port. If you require a crane, forklift, specialised loading arrangements or other resources, you must inform Skagerak Facility in advance.
Any requirements for meals during mobilisation must also be agreed well in advance.
If the project requires additional mobilisation time or the arrangements change, this must be discussed with Skagerak Facility. Additional time or specialised resources may incur extra costs in accordance with the booking terms and conditions.
During your expedition
Working on board, safety and technical support
All participants must complete an onboard safety briefing and familiarisation before departure.
The crew is responsible for the vessel's operation and safety, including the use of the vessel's cranes and other lifting equipment.
The University of Gothenburg's technical staff can provide support with the vessel's permanently installed scientific equipment. The need for technical staff and the level of support included must be agreed for each expedition.
The research team or project organisation is normally responsible for scientific activities, sample handling and data collection, unless otherwise agreed.
All activities are carried out in accordance with the vessel's safety procedures. Risk assessments and safety briefings are conducted with the relevant personnel before specialised operations.
Changes during the expedition
Weather conditions, technical limitations or changing scientific requirements may mean that the expedition plan needs to be adjusted.
Changes affecting the cruise plan, operations, equipment, staffing or costs must be coordinated with Skagerak Facility and the responsible personnel on board.
The crew can advise on practical and technical matters, but changes affecting the scope or budget of the booking must be approved through Skagerak Facility.
The vessel's Master is responsible for decisions concerning the safe operation of the vessel.
After your expedition
Demobilisation and cleaning
At the end of the expedition, project equipment, collected samples and personal belongings must be removed from the vessel according to the agreed schedule.
Demobilisation may need to take place over a weekend. You should therefore arrange transport and any lifting assistance well in advance. You should also notify Skagerak Facility beforehand if meals will be required during unloading.
If it is not possible to remove all equipment during the scheduled demobilisation period, you must contact Skagerak Facility as soon as possible. Additional time or resources must be approved in advance and may incur extra costs.
All cabins, laboratories and workspaces used by the project must be left clean in accordance with the vessel's procedures. The project leader must ensure that participants have removed their equipment and left the areas tidy.
Data and samples
The project team is normally responsible for collecting, handling, storing and analysing its data and samples, unless otherwise agreed.
You should therefore plan how samples and data will be transported, stored and managed after the expedition.
The vessel has systems for storing and transferring certain types of scientific data. Specific rules may apply to the storage, transfer and publication of marine survey data.
Evaluation and research results
Skagerak Facility welcomes feedback and experiences following an expedition.
For research projects, an evaluation may be submitted through Marine Facilities Planning (MFP), in accordance with current procedures.
We also welcome information about scientific findings and publications resulting from research conducted on board R/V Skagerak. This helps us demonstrate how the research infrastructure is used and its contribution to marine research.
For commercial projects, any sharing of project results is subject to agreement.
Questions about your expedition?
Contact Skagerak Facility if you need assistance with planning, technical preparations, safety documentation or practical arrangements before and after your expedition.